Two-Week Sprint
Technical Prototype
We have posted the instructions for all assignments in the current sprint.
The primary focus of this sprint is the technical prototype. This sprint must be in CUGL, and it should run on a mobile device. The presentations for this sprint will be more reasonable, and will last the entire week.
You should also remember the documents for this sprint. The technical documents include both the architecture specification and the visual design specification. While the designers should have no problem with the latter, the former is notoriously hard to get right.
Walker White
ANNOUNCEMENT