Assignment 2
Where does the time go?
1. Getting started -- software and hardware, loading the sources, building the system
2. Design and programming
3. Blind alleys
4. Troubles, bugs, testing
5. Reporting and documentation
Item #2 was typically less than 25% of reported effort
Previous slide
Next slide
Back to first slide
View graphic version