Home Contents Search

Current Status
Up ]

 

Operations Research Status Report, Q2 1999

Installed Equipment

1 Server (Dual Processor Pentium II 300 Mhz with MMX, 128Mb RAM, 9.1Gb hard drive)
10 Workstations (Pentium II 300 Mhz with MMX, 128Mb RAM)
3 Switches (24 port)

Faculty Participants
Lee Schruben (http://www.engr.cornell.edu/or/Schruben.html)
David Ruppert (http://www.engr.cornell.edu/or/Ruppert.html)
Elizabeth Slate (http://www.engr.cornell.edu/or/Slate.html)
Peter Jackson (http://www.engr.cornell.edu/or/Jackson.html)
Robin Roundy (http://www.engr.cornell.edu/or/Roundy.html)
Jack Muckstadt (http://www.engr.cornell.edu/or/Muckstadt.html)

Projects In Progress
Advances in Simulation Methodology for Semiconductor Fabrication (Schruben, Roundy)
Equipment Failure Analysis and Optimization of Preventative Maintenance Schedules (Slate)
Simulation of Service Parts Distribution Systems (Jackson, Muckstadt)
Application of Cyclic Scheduling to Facility Design (Jackson)
Educational Design Studies for Global Manufacturing (Muckstadt)
Integration of Transportation and Production Scheduling (Jackson)

 

Home Up

Last modified on: 10/12/99